Skip to content

Timeline of LHC Run 3 Measurements in 2022

This page provides quick access links to logbook entries of important OMC shifts or measurements done during the LHC 2022 commissioning and MDs. Some entries (underlined) offer a tooltip when hovered, with a quick description of the important information from that entry. The tables below can be sorted by clicking next to the column headers.

Results Visualization

Various results graphs and the scripts to make them are available in lintrack:

/afs/cern.ch/eng/sl/lintrack/LHC_commissioning2022/

Start Date End Date Shifts Type Shift Purpose Logbook Link
2022-04-23 08:00 2022-04-23 16:30 1H Commissioning Injection Linear Optics Shift Plan / Summary
2022-04-24 12:50 2022-04-24 20:40 1H Commissioning Injection NonLinear Optics (+Ballistic test) Shift Plan / Summary
2022-04-25 11:45 2022-04-25 19:35 1W Commissioning First Flat-Top Measurements Shift Plan / Summary
2022-04-26 11:15 2022-04-26 16:22 0.6W Measurement Flat-Top with MQTs & Local Corrections Entry
2022-04-27 20:30 2022-04-28 05:10 1WN Commissioning First Squeeze to 60cm and 30cm Shift Plan / Summary
2022-04-28 02:54 2022-04-28 02:54 0WN Bug Report Segment-by-Segment Bug with opticsfiles Entry
2022-04-28 22:20 2022-04-28 23:45 0.2WN Commissioning First Ballistic Optics Measurements Shift Plan / Summary
2022-05-02 11:45 2022-05-03 03:30 0.9W 1WN Commissioning Measurements in the Squeeze Shift Plan / Summary
2022-05-03 01:09 2022-05-03 01:09 0WN Measurement First SbS and APJ K-Modulations Entry
2022-05-03 02:30 2022-05-03 02:30 0WN Measurement SbS and APJ Mixin K-Modulations Entry
2022-05-04 10:50 2022-05-04 12:30 0.2W Knobs Design Felix S.' Rigid Waist Shift Knobs Design Shift Plan
2022-05-08 23:00 2022-05-08 23:00 0HN Commissioning IR1 Local Coupling SbS Refinement Entry
2022-05-08 00:45 2022-05-08 04:20 0.5HN Commissioning Second Ballistic Optics Measurements Shift Plan / Summary
2022-05-08 19:45 2022-05-09 05:00 1WN Commissioning 30cm Cycle and Amplitude Detuning Measurements Shift Plan
2022-05-09 04:00 2022-05-09 04:00 0WN Measurement IR1 Local Coupling Refinement Trimmed Entry
2022-05-10 00:20 2022-05-10 06:20 0.8N Commissioning IR5 Rigid Waist Shift Measurements Shift Plan / Summary
2022-05-21 00:50 2022-05-21 06:00 0.8HN Commissioning Van der Meer Optics Shift Plan
2022-05-26 15:30 2022-05-26 22:45 0.4H 0.5HN Investigation Post VELO Stop 30cm Optics Issues Shift Plan / Summary
2022-05-26 20:24 2022-05-26 20:24 0HN Measurement Beam 2 Q4 Adjustments Entry / Summary
2022-05-27 19:40 2022-05-27 23:15 0.4HN Commissioning 60 Degrees Optics Measurements Shift Plan / Summary
2022-05-28 13:30 2022-05-28 19:00 0.6H Investigation VELO Stop Issues Investigations - Part 1 Shift Plan
2022-05-29 00:45 2022-05-29 04:30 0.5HN Investigation VELO Stop Issues Investigations - Part 2 Shift Plan / Summary
2022-05-29 15:00 2022-05-29 23:59 0.2H 0.4HN Investigation VELO Stop Issues Investigations - Part 3 Shift Plan / Summary
2022-06-01 02:30 2022-06-01 07:00 0.6WN Commissioning IR1 Rigid Waist Shift Measurements Shift Plan / Summary
2022-06-03 19:40 2022-06-04 00:30 0.6WN Investigation VELO Stop Issues Investigations - Part 4 Shift Plan / Summary
2022-06-04 15:00 2022-06-04 23:59 0.3H 0.8HN Commissioning Local Corrections & AmpDet with NonLin Corrections Shift Plan / Summary
2022-06-06 08:30 2022-06-06 11:45 0.5H Commissioning Measurements and Corrections with Crossing Angles Shift Plan
2022-06-09 06:13 2022-06-09 16:00 0.2WN 1W Commissioning New Global Corrections with Crossing Angles Shift Plan
2022-06-11 01:00 2022-06-11 07:00 0.7HN Commissioning Measurements & K-Modulation at 60cm and 45cm Shift Plan / Summary
2022-06-11 23:30 2022-06-12 07:00 1HN Commissioning 30cm Corrections Validations Shift Plan / Summary
2022-06-17 10:00 2022-06-17 16:00 0.8W Commissioning IR5 B2 Waist Shift and K-Modulations Shift Plan / Summary
2022-06-24 21:30 2022-06-25 06:45 1.1HN MD 6863 AmpDet From High-Order Errors Shift Plan / Summary
2022-06-25 22:00 2022-06-26 06:00 1HN MD 6904 3Qy Compensation Shift Plan / Summary
2022-07-02 04:00 2022-07-02 07:00 0.4HN Commissioning Injection and Ramp Measurements Shift Plan / Summary
2022-07-13 19:00 2022-07-14 01:30 0.8WN Commissioning Long Range Beam-Beam Wire Compensation Shift Plan / Summary
2022-07-19 08:00 2022-07-19 13:30 0.7W Commissioning IPs Phase Shift Knob at Injection Optics Shift Plan / Summary B1 / Summary B2
2022-08-04 14:00 2022-08-04 20:20 0.4W 0.4WN Commissioning Measurements in the Ramp Shift Plan / Summary
2022-11-06 04:30 2022-11-06 14:30 0.5WN 0.7W MD 8523 Amplitude Detuning in the Squeeze and Skew-Octupole Measurements at 30cm Shift Plan / Summary
2022-11-07 05:30 2022-11-07 07:00 0.2WN MD 7203 Rematched IR7 Optics Shift Plan / Summary
2022-11-07 18:20 2022-11-08 00:40 0.5WN MD 7003 2023 LHC Configuration Shift Plan / Summary