Skip to content

Timeline of LHC Run 3 Measurements in 2025

This page provides quick access links to logbook entries of important OMC shifts or measurements done during the LHC 2026 commissioning and MDs. Some entries (underlined) offer a tooltip when hovered, with a quick description of the important information from that entry. The tables below can be sorted by clicking next to the column headers.

Shift Categorization

The letters in the shifts column have the following meaning:

  • W = Weekdays (Day)
  • WN = Weekdays (Night)
  • H = Holidays or weekend (Day)
  • HN = Holidays or weekend (Night)

1 shift consists of an 8h period, so e.g. 0.5W means a 4h shift on a weekday during daytime.

We consider only the "productive" time for these shifts, i.e. time where the machine is in a stable state suitable for measurements, this is why the number might be lower than the time difference between start and end.

Hovering the column name will show a tooltip with more information.

Start Date End Date Shifts Type Shift Purpose Logbook Link
2026-02-26 13:30 2026-02-26 23:30 1W 0.25WN Commissioning Injection, Ramp and Flattop Validation Shift Start / Summary ()