This page provides quick access links to logbook entries of relevant OMC shifts or measurements and MDs done on the PS in 2023.

Shift Categorization

The letters in the shifts column have the following meaning:

  • W = Weekdays (Day)
  • WN = Weekdays (Night)
  • H = Holidays or weekend (Day)
  • HN = Holidays or weekend (Night)

1 shift consists of an 8h period, so e.g. 0.5W means a 4h shift on a weekday during daytime.

We consider only the "productive" time for these shifts, i.e. time where the machine is in a stable state suitable for measurements, this is why the number might be lower than the time difference between start and end.

Hovering the column name will show a tooltip with more information.

Start Date End Date Shifts Type Contact Shift Purpose Logbook Link
2023-04-12 10:00 2023-04-12 17:00 1W MD Vittorio Setup of bare machine flat cycle and Q/Q' measurements. TbT data checks Start
2023-04-17 23:00 2023-04-18 04:00 0.5W MD Wietse zero dispersion Start
2023-04-19 20:40 2023-04-20 01:30 0.5W MD Wietse 3Qy rdt measurement vs skew sextupole strength. Start
2023-04-22 02:40 2023-04-22 05:30 0.5W MD Wietse 3Qy rdt measurement vs skew sextupole strength. Also trying octupole RDT Start
2023-04-25 10:30 2023-04-25 15:00 0.5W MD Vittorio Tune and chroma on the 10GeV cycle Start
2023-05-02 15:30 2023-05-02 17:00 0.1W MD Ewen Logging data during gammatr jump for radial loop study Start
2023-05-10 16:30 2023-05-10 18:30 0.2W MD Vittorio 18GeV bare machine cycle Start
2023-05-11 10:00 2023-05-11 16:00 0.5W MD Vittorio 18GeV bare machine cycle Start
2023-05-23 10:30 2023-05-23 10:30 0.1W MD Wietse zero dispersion with different PSB beams - no end time in elog Start
2023-06-07 11:00 2023-06-07 15:00 0.5W MD Vittorio 23GeV bare machine cycle Start
2023-06-08 11:00 2023-06-08 15:00 0.5W MD Vittorio 23GeV bare machine cycle Start
2023-06-09 17:00 2023-06-09 18:00 0.1W MD Vittorio 23GeV bare machine cycle Start
2023-06-14 10:30 2023-06-14 12:30 0.2W MD Wietse Synchronizing BBQ with regular BPMs test Start
2023-06-16 10:00 2023-06-16 17:30 1W MD Vittorio 7GeV bare machine cycle Start
2023-06-20 16:30 2023-06-20 17:30 0.1W MD Ewen Logging data during gammatr jump for radial loop study Start
2023-07-03 10:30 2023-07-03 11:30 0.1W MD Ewen debugging TBT acquesition Start
2023-07-05 10:30 2023-07-05 11:30 0.1W MD Ewen debugging TBT acquesition on Wietse's cycles Start
2023-07-12 17:40 2023-07-12 19:30 0.2W MD Vittorio 14GeV bare machine cycle Start
2023-07-13 16:30 2023-07-13 17:30 0.1W MD Ewen debugging TBT acquesition on Wietse's cycles Start
2023-07-17 10:30 2023-07-17 14:30 0.5W MD Vittorio testing 10GeV cycle with PFW and F8L Start
2023-07-27 14:30 2023-07-27 15:30 0.1W MD Wietse zero dispersion with different PSB beams Start
2023-08-03 09:44 2023-08-03 13:30 0.5W MD Wietse zero dispersion with different PSB emits Start
2023-08-04 10:30 2023-08-04 10:30 0.0W MD Wietse zero dispersion - no clear entry in elog Start
2023-08-07 11:30 2023-08-07 15:30 0.5W MD Wietse 3Qy RDT measurements Start
2023-08-10 11:30 2023-08-10 17:30 0.5W MD Wietse Zero disperions optics with different intensities Start
2023-08-14 11:00 2023-08-14 15:30 0.5W MD Wietse Testing 3Qy correction Start
2023-09-11 16:40 2023-09-11 18:10 0.5W MD Vittorio Tune and chroma on 5GeV cycle Start
2023-09-14 15:15 2023-09-14 18:10 0.25W MD Vittorio Tune and chroma on 23GeV cycle Start
2023-09-15 09:45 2023-09-15 15:00 0.5W MD Vittorio Chroma meas on 23GeV cycle, kicking with ACD during 23GeV ramp Start
2023-09-26 15:15 2023-09-26 17:00 0.25W MD Vittorio Bare machine chroma meas at different energies + testing varying F8L/PFW on 23GeV Start
2023-09-29 16:30 2023-09-29 19:30 0.5W MD Vittorio Bare machine at different energies on same day Start
2023-10-02 20:30 2023-10-02 23:15 0.5WN MD Wietse Statistics for zero dispersion study Start
2023-10-06 10:00 2023-10-06 18:30 1W MD Vittorio Bare machine at different energies + MRP corr Start
2023-10-09 10:00 2023-10-09 17:30 1W MD Vittorio Bare machine at different energies + MRP corr Start
2023-10-10 14:10 2023-10-10 18:30 0.5W MD Wietse Extra zero dispersion + new RDT measurements. MD9408 Start
2023-10-18 22:30 2023-10-19 04:00 1WN MD Vittorio 23GeV bare cycle saturation study Start
2023-10-19 16:00 2023-10-20 19:00 0.5W MD Vittorio tune vs F8L on 10GeV Start
2023-10-20 02:00 2023-10-20 17:30 0.5W MD Vittorio tune vs F8L on 10GeV cont Start
2023-10-22 14:30 2023-10-22 18:00 0.5W MD Wietse cycle setup for RDT study (2Qx+Qy) Start
2023-10-23 14:00 2023-10-23 17:30 0.5W MD Vittorio chroma vs F8L on 10GeV Start
2023-10-23 18:10 2023-10-24 00:30 1WN MD Wietse RDT study (2Qx+Qy) Start
2023-10-23 23:00 2023-10-24 06:00 1WN MD Vittorio chroma vs F8L on 10GeV cont. Start
2023-10-24 00:50 2023-10-24 07:00 1WN MD Wietse PFW control with ML test Start
2023-10-25 00:00 2023-10-25 04:00 0.5WN MD Vittorio varying F8L on 18GeV Start
2023-10-25 04:30 2023-10-25 11:10 1W MD Wietse PFW control with ML test Start
2023-10-25 15:45 2023-10-26 01:30 1WN MD Vittorio Q/Q' on 18GeV with PFW Start
2023-10-26 01:30 2023-10-26 08:00 1WN MD Wietse PFW-control with ML test Start
2023-10-26 14:00 2023-10-26 17:30 0.5W MD Ewen Radial loop with ACD Start
2023-10-26 15:00 2023-10-28 04:00 1.5WN MD Vittorio Q/Q' vs energy on bare machine cycles Start
2023-10-27 01:00 2023-10-27 07:00 1WN MD Wietse PFW-control with ML test Start
2023-10-27 20:00 2023-10-27 20:30 0.1WN MD Ewen ACD kicks to survive 10GeV ramp Start
2023-10-28 14:45 2023-10-28 22:36 1H MD Vittorio Q/Q' dependence on PFW at 10GeV Start
2023-10-29 11:30 2023-10-29 15:30 0.5H MD Ewen ACD through transition + 18GeV optics meas on 23GeV cycle Start
2023-10-29 14:00 2023-10-29 18:00 0.5H MD Vittorio Q/Q' on 10/18GeV cycle with PFW Start
2023-11-01 09:30 2023-11-01 17:00 1W MD Wietse Testing f2010 correction, and comp i/k calibration from f0030 to f2010 Start
2023-11-01 15:00 2023-11-01 20:00 0.5W MD Vittorio Q and Q' change and ACDmeas with F8L on 2GeV bare machine Start
2023-11-02 10:30 2023-11-02 20:00 1W MD Vittorio Q and Q' change with F8L and PFW on 2GeV bare machine Start
2023-11-03 10:00 2023-11-03 15:00 0.5W MD Ewen Preparation and test of GammaTR jump on flat cycle + ACD kicks through knobs Start
2023-11-03 10:30 2023-11-03 20:00 1W MD Vittorio Q and Q' change with F8L and PFW on 2GeV bare machine plus measurements with AC Dipole excitation Start