Timeline of PS optics measurements in 2024¶
This page provides quick access links to logbook entries of relevant OMC shifts or measurements and MDs done on the PS in 2024.
Shift Categorization
The letters in the shifts column have the following meaning:
- W = Weekdays (Day)
- WN = Weekdays (Night)
- H = Holidays or weekend (Day)
- HN = Holidays or weekend (Night)
1 shift consists of an 8h period, so e.g. 0.5W means a 4h shift on a weekday during daytime.
We consider only the "productive" time for these shifts, i.e. time where the machine is in a stable state suitable for measurements, this is why the number might be lower than the time difference between start and end.
Hovering the column name will show a tooltip with more information.
| Start Date | End Date | Shifts | Type | Contact | Shift Purpose | Logbook Link |
|---|---|---|---|---|---|---|
| 2024-04-12 10:00 | 2024-04-12 13:00 | 0.3W | MD | Vittorio | First OMC checks + injection Q shift | Start |
| 2024-04-15 11:00 | 2024-04-15 17:00 | 0.5W | MD | Wietse | 3Qy bare measurement | Start |
| 2024-04-16 13:00 | 2024-04-16 15:00 | 0.2W | MD | Vittorio | Injection eddy currents | Start |
| 2024-04-18 17:00 | 2024-04-18 19:00 | 0.2W | MD | Vittorio | PFW response 10GeV | Start |
| 2024-04-19 12:00 | 2024-04-19 19:00 | 1.0W | MD | Wietse | a3 RDT correction test | Start |
| 2024-04-22 12:00 | 2024-04-22 17:30 | 0.5W | MD | Wietse | 3Qy correction test | Start |
| 2024-04-25 14:00 | 2024-04-25 18:00 | 0.5W | MD | Vittorio | PFW response at 10/2GeV | Start |
| 2024-04-26 11:00 | 2024-04-26 12:00 | 0.1W | MD | Wietse | PFW controller | Start |
| 2024-04-29 14:30 | 2024-04-29 18:00 | 0.5W | MD | Wietse | BWS polarity + 3Qy RDT | Start |
| 2024-05-08 11:00 | 2024-05-08 19:00 | 1.0W | MD | Vittorio | Injection eddy currents | Start |
| 2024-05-09 14:20 | 2024-05-09 17:00 | 0.5W | MD | Ewen | Attempting optics+coupl meas during transition | Start |
| 2024-05-10 16:30 | 2024-05-10 19:00 | 0.5W | MD | Vittorio | PFW response at 2GeV | Start |
| 2024-05-13 10:00 | 2024-05-13 15:30 | 0.5W | MD | Wietse | PSB-PS dispersion comparisons | Start |
| 2024-05-14 12:30 | 2024-05-14 18:00 | 0.5W | MD | Wietse | PSB-PS dispersion comparisons | Start |
| 2024-05-21 09:30 | 2024-05-21 14:00 | 0.5W | MD | Wietse | PSB ring-to-ring dispersion | Start |
| 2024-05-29 10:00 | 2024-05-29 13:00 | 0.3W | MD | Ewen | OMC while replicating SuperKEK noise | Start |
| 2024-05-29 11:00 | 2024-05-29 14:00 | 0.3W | MD | Wietse | PSB dispersion | Start |
| 2024-06-17 12:30 | 2024-06-17 17:00 | 0.5W | MD | Wietse | Zero dispersion above/below transition | Start |
| 2024-06-18 11:30 | 2024-06-18 13:30 | 0.2W | MD | Vittorio | F8L response at 10GeV | Start |
| 2024-06-20 11:30 | 2024-06-20 18:30 | 1.0W | MD | Vittorio | ACD optics at 10GeV vs F8L | Start |
| 2024-06-21 10:30 | 2024-06-21 18:00 | 1.0W | MD | Vittorio | Chromitc beta at 2GeV bare cycle | Start |
| 2024-06-24 10:30 | 2024-06-24 18:00 | 1.0W | MD | Wietse | Optics checks of zero dispersion above/below transition | Start |
| 2024-06-26 12:30 | 2024-06-26 17:00 | 0.5W | MD | Vittorio | ACD optics at 10GeV vs F8L | Start |
| 2024-06-27 10:00 | 2024-06-27 18:00 | 1.0W | MD | Vittorio | Optics shifts with degraded orbit at 2GeV | Start |
| 2024-06-28 11:00 | 2024-06-28 17:30 | 0.5W | MD | Vittorio | F8L chroma response at 10GeV | Start |
| 2024-06-29 12:00 | 2024-06-29 21:00 | 1.0W | MD | Wietse | Zero dispersion above transition | Start |
| 2024-07-02 10:00 | 2024-07-02 12:00 | 0.1W | MD | Vittorio | Chroma at 14GeV bare machine | Start |
| 2024-07-03 10:00 | 2024-07-03 13:00 | 0.1W | MD | Vittorio | 2GeV F8L chroma response | Start |
| 2024-07-04 16:00 | 2024-07-04 18:30 | 0.1W | MD | Vittorio | 2GeV F8L chroma response | Start |
| 2024-07-07 10:30 | 2024-07-07 14:30 | 0.5W | MD | Wietse | Zero dispersion over transition with BCMS cycle | Start |
| 2024-07-12 16:45 | 2024-07-12 19:00 | 0.1W | MD | Vittorio | Setup for optics on 23GeV platteau | Start |
| 2024-07-13 13:00 | 2024-07-13 15:30 | 0.2W | MD | Vittorio | ACD optics at 5GeV bare machine | Start |
| 2024-07-24 16:50 | 2024-07-24 19:00 | 0.2W | MD | Vittorio | F8L response at 18GeV | Start |
| 2024-07-25 16:00 | 2024-07-25 19:10 | 0.2W | MD | Vittorio | F8L response at 18GeV | Start |
| 2024-07-26 15:00 | 2024-07-26 18:00 | 0.2W | MD | Vittorio | F8L response at 18GeV | Start |
| 2024-08-01 15:00 | 2024-08-01 18:30 | 0.2W | MD | Vittorio | F8L response at 18GeV | Start |
| 2024-08-03 16:00 | 2024-08-03 18:00 | 0.2W | MD | Wietse | F2010 correction | Start |
| 2024-08-04 14:00 | 2024-08-04 23:30 | 1.0W | MD | Wietse | PFW controller test | Start |
| 2024-08-06 16:20 | 2024-08-06 18:30 | 0.2W | MD | Vittorio | F8L response at 18GeV | Start |
| 2024-08-07 16:00 | 2024-08-07 20:00 | 0.5W | MD | Vittorio | PFW response at 2GeV | Start |
| 2024-08-27 16:00 | 2024-08-27 18:00 | 0.2W | MD | Vittorio | PFW response at 2GeV | Start |
| 2024-08-28 15:30 | 2024-08-28 18:00 | 0.5W | MD | Vittorio | 2GeV-PFW, 2eV bare ACD, 18GeV chroma no MRPcorr | Start |
| 2024-08-29 15:30 | 2024-08-29 17:30 | 0.3W | MD | Vittorio | ACD at 10GeV | Start |
| 2024-08-30 19:00 | 2024-08-30 19:30 | 0.1W | MD | Vittorio | ACD at 18GeV | Start |
| 2024-09-03 16:30 | 2024-09-03 17:30 | 0.1W | MD | Vittorio | ACD at 18GeV | Start |
| 2024-09-10 16:30 | 2024-09-10 18:30 | 0.2W | MD | Vittorio | PFW at 18GeV | Start |
| 2024-09-16 12:00 | 2024-09-16 17:30 | 0.5W | MD | Wietse | Deconvolution test with zero dispersion | Start |
| 2024-09-18 16:00 | 2024-09-18 18:30 | 0.3W | MD | Vittorio | Testing ACD at 23GeV long platteau | Start |
| 2024-09-19 13:30 | 2024-09-19 15:00 | 0.2W | MD | Vittorio | ACD at 23GeV long platteau | Start |
| 2024-09-20 11:00 | 2024-09-20 19:00 | 1.0W | MD | Vittorio | ACD at 18GeV long platteau | Start |
| 2024-09-24 17:30 | 2024-09-24 21:00 | 0.5W | MD | Ewen | Optics measurement on double TOF extraction bump | Start |
| 2024-09-26 16:30 | 2024-09-26 18:00 | 0.2W | MD | Vittorio | ACD at 10GeV | Start |
| 2024-11-01 11:30 | 2024-11-01 18:00 | 0.5W | MD | Vittorio | Optics shift at 2GeV with degraded vertical orbit | Start |
| 2024-11-04 11:20 | 2024-11-04 15:40 | 0.3W | MD | Vittorio | PFW response at 2GeV | Start |
| 2024-11-05 11:30 | 2024-11-05 19:00 | 0.5W | MD | Vittorio | PFW response at 2GeV | Start |
| 2024-11-07 15:30 | 2024-11-07 18:22 | 0.2W | MD | Vittorio | PFW response at 2GeV | Start |
| 2024-11-08 06:00 | 2024-11-08 11:00 | 0.2W | MD | Vittorio | PFW response at 2GeV | Start |
| 2024-11-21 10:30 | 2024-11-21 22:00 | 1.5W | MD | Ewen | RDT vs PFW on flat cycle | Start |
| 2024-11-23 15:50 | 2024-11-23 20:00 | 0.5W | MD | Vittorio | PFW response at 2GeV | Start |
| 2024-11-24 12:00 | 2024-11-24 12:30 | 0.5W | MD | Vittorio | 10GeV cycle with LHC PFW settings | Start |
| 2024-11-25 01:00 | 2024-11-25 02:00 | 0.2W | MD | Vittorio | 18GeV cycle with LHC PFW settings | Start |