Timeline of PS optics measurements in 2026¶
This page provides quick access links to logbook entries of relevant OMC shifts or measurements and MDs done on the PS in 2026.
Shift Categorization
The letters in the shifts column have the following meaning:
- W = Weekdays (Day)
- WN = Weekdays (Night)
- H = Holidays or weekend (Day)
- HN = Holidays or weekend (Night)
1 shift consists of an 8h period, so e.g. 0.5W means a 4h shift on a weekday during daytime.
We consider only the "productive" time for these shifts, i.e. time where the machine is in a stable state suitable for measurements, this is why the number might be lower than the time difference between start and end.
Hovering the column name will show a tooltip with more information.
| Start Date | End Date | Shifts | Type | Contact | Shift Purpose | Logbook Link |
|---|---|---|---|---|---|---|
| 2026-02-05 12:00 | 2026-02-05 17:00 | 0.625W | MD16783 | Katriya | PFW response 10GeV bare machine | Start |
| 2026-02-06 12:00 | 2026-02-06 17:00 | 0.625W | MD16783 | Katriya | PFW response 10GeV (data: 02/05) | Start |
| 2026-02-14 02:00 | 2026-02-14 05:00 | 0.375HN | MD16783 | Katriya | PFW response 10GeV (data: 02/05) | Start |
| 2026-02-15 00:00 | 2026-02-15 03:00 | 0.375HN | MD16783 | Katriya | PFW response 10GeV - F8L+5CM (data: 02/05) | Start |
| 2026-02-27 14:00 | 2026-02-27 20:00 | 0.75W | MD16783 | Ewen/Katriya | 10GeV ACD for BPM calibration - low quality | Start |
| 2026-04-09 12:30 | 2026-04-09 17:30 | 0.625W | MD18543 | Ewen/Mattia/Wietse | Numerical deconvolution / top energy ZDx | Start |
| 2026-04-10 09:30 | 2026-04-09 20:00 | 1.31W | MD18543 | Ewen/Mattia | Top energy ZDx + ACD | Start |
| 2026-04-12 15:00 | 2026-04-12 23:59 | 0.3W 0.8WN | MD18603 | Ewen | PFW Q response 18GeV bare machine | Start |
| 2026-04-25 09:30 | 2026-04-25 11:00 | 0.2H | MD16783 | Katriya | PFW response 10GeV bare machine | Start |
| 2026-04-28 01:00 | 2026-04-28 06:00 | 0.625WN | MD18603 | Ewen | PFW Q response 18GeV bare machine | Start |
| 2026-06-18 10:00 | 2026-06-18 14:00 | 0.5W | MD18603 | Ewen/Daniel | Q oscillation | Start |
| 2026-07-08 13:00 | 2026-07-08 17:00 | 0.5W | MD18603 | Ewen/Daniel | Q oscillation + tomography | Start |
| 2026-07-26 13:00 | 2026-07-26 13:00 | 0.0W | Analysis | Sara | LEQ Kmod on 5GeV platteau - analysis in PSMD elog | - |
| 2026-07-26 14:00 | 2026-07-27 01:00 | 0.5H 0.9HN | MD18603 | Ewen | Chroma response on 18GeV - F8L | Start |
| 2026-07-27 11:00 | 2026-07-27 14:00 | 0.5W | MD18603 | Ewen | Chroma response on 18GeV - WDW (data in 08/July) | Start |