Timeline of SPS optics measurements in 2024¶
This page provides quick access links to logbook entries of relevant OMC shifts or measurements and MDs done on the SPS in 2024.
Shift Categorization
The letters in the shifts column have the following meaning:
- W = Weekdays (Day)
- WN = Weekdays (Night)
- H = Holidays or weekend (Day)
- HN = Holidays or weekend (Night)
1 shift consists of an 8h period, so e.g. 0.5W means a 4h shift on a weekday during daytime.
We consider only the "productive" time for these shifts, i.e. time where the machine is in a stable state suitable for measurements, this is why the number might be lower than the time difference between start and end.
Hovering the column name will show a tooltip with more information.
| Start Date | End Date | Shifts | Type | Contact | Shift Purpose | Logbook Link |
|---|---|---|---|---|---|---|
| 2024-05-06 14:00 | 2024-05-06 18:00 | 0.5W | MD | Panos/Ewen/Josch | OMC tool/ADT tests | Start |
| 2024-05-07 10:00 | 2024-05-07 14:00 | 0.2W | MD | Panos/Ewen/Josch | OMC tool/ADT tests | None |
| 2024-05-21 10:00 | 2024-05-21 14:00 | 0.2W | MD | Panos | ADT ACD tests | Start |
| 2024-10-28 14:00 | 2024-10-28 21:00 | 0.3W | MD | Panos/Ewen/Josch | OMC tests - Q20 proton - poor availability | None |
| 2024-11-04 14:00 | 2024-11-04 20:30 | 0.3W | MD | Panos/Ewen/Josch | OMC tests - Q26 ions - poor availability | None |
| 2024-11-18 12:00 | 2024-11-18 13:00 | 0.3W | MD | Panos/Ewen/Josch | Detuning - poor availability | Start |
| 2024-11-19 14:00 | 2024-11-19 17:00 | 0.0W | MD | Ewen/Panos | Detuning - no availability | None |