This page provides quick access links to logbook entries of important OMC shifts or measurements done during the LHC 2023 commissioning and MDs. Some entries (underlined) offer a tooltip when hovered, with a quick description of the important information from that entry. The tables below can be sorted by clicking next to the column headers.

Results Visualization

Various results graphs and the scripts to make them are available in lintrack:

/afs/cern.ch/eng/sl/lintrack/LHC_commissioning2023/

Start Date End Date Shifts Type Shift Purpose Logbook Link
2023-03-28 15:30 2023-03-29 01:30 0.5W 0.5WN Commissioning Injection Linear Optics /
2023-04-01 09:00 2023-04-01 22:00 1.5H Commissioning Ramp and Squeeze Linear Optics /
2023-04-06 19:30 2023-04-07 03:00 1WN Commissioning Measurements in the Ramp + Validation /
2023-04-08 03:00 2023-04-08 07:15 0.5HN Commissioning a4 Corrections at 30cm /
2023-04-08 20:00 2023-04-09 05:15 1HN Commissioning NL Studies at Injection /
2023-04-09 23:46 2023-04-10 07:10 1HN Commissioning Ions Virgin Optics /
2023-04-14 11:30 2023-04-14 15:30 0W Analysis Preparation of local corrections for ions
2023-04-16 17:50 2023-04-16 23:00 0.5H Commissioning Ions Optics Validation /
2023-06-08 16:30 2023-06-08 20:00 0.5W Commissioning High Beta Optics Validation /
2023-06-13 12:00 2023-06-13 13:00 0W Analysis Preparation of 3Qy knobs for next MD
2023-06-14 05:00 2023-06-14 15:15 1W MD 9549 b5 RDT corr, 3Qy corr, b4 RDT /
2023-06-15 03:30 2023-06-15 03:40 0WN MD 9543 Failing IR corrs MD: abbanded for cryo /
2023-07-14 01:00 2023-07-14 04:30 0.5WN Commissioning Ions Optics commissioning 14/07 /
2023-08-30 18:50 2023-08-30 21:30 0.5WN Commissioning INJ+FT revalidation post triplet repair /
2023-08-31 00:00 2023-08-31 04:30 0.5WN Commissioning 30cm re-validation + f2002 at inj /
2023-09-01 20:30 2023-09-02 04:30 1HN Commissioning High Beta Optics corrections /
2023-09-03 01:00 2023-09-03 04:40 0.5HN Commissioning PPref optics validation /
2023-09-06 00:00 2023-09-06 01:00 0W Analysis Review of Bad BPMs over recent meas
2023-09-12 00:00 2023-09-12 01:00 0WN Analysis Re-analysis of ION b3 scan in BBsrc
2023-09-13 00:00 2023-09-13 01:00 0WN Commissioning 13/09 Failed ION commissioning /
2023-09-14 02:30 2023-09-14 05:00 0.25WN Commissioning 14/09 Failed ION commissioning /
2023-09-14 15:30 2023-09-14 19:30 0.5W 0.5WN Commissioning ION optics at FT validation. B3 corrs /
2023-09-21 09:30 2023-09-21 14:00 1W MD 10385 MO response at Injection /
2023-10-26 12:30 2023-10-26 15:15 0.5W Commissioning ION optics in ramp. Dispersion at FT /
2023-11-01 23:28 2023-11-01 23:41 0WN Analysis Re-analysis of ions ramp. 3Qy vs ramp