Timeline of LHC Run 3 Measurements in 2023

This page provides quick access links to logbook entries of important OMC shifts or measurements done during the LHC 2023 commissioning and MDs. Some entries (underlined) offer a tooltip when hovered, with a quick description of the important information from that entry. The tables below can be sorted by clicking next to the column headers.

Results Visualization

Various results graphs and the scripts to make them are available in lintrack:

/afs/cern.ch/eng/sl/lintrack/LHC_commissioning2023/

Start Date End Date Shifts Type Shift Purpose Logbook Link
2023-03-28 15:30 2023-03-29 01:30 0.5W 0.5WN Commissioning Injection Linear Optics Shift Plan / Summary
2023-04-01 09:00 2023-04-01 22:00 1.5H Commissioning Ramp and Squeeze Linear Optics Shift Plan / Summary
2023-04-06 19:30 2023-04-07 03:00 1WN Commissioning Measurements in the Ramp + Validation Shift Plan / Summary
2023-04-08 03:00 2023-04-08 07:15 0.5HN Commissioning a4 Corrections at 30cm Shift Plan / Summary
2023-04-08 20:00 2023-04-09 05:15 1HN Commissioning NL Studies at Injection Shift Plan / Summary
2023-04-09 23:46 2023-04-10 07:10 1HN Commissioning Ions Virgin Optics Start / End
2023-04-14 11:30 2023-04-14 15:30 0W Analysis Preparation of local corrections for ions
2023-04-16 17:50 2023-04-16 23:00 0.5H Commissioning Ions Optics Validation Shift Plan / Summary
2023-06-08 16:30 2023-06-08 20:00 0.5W Commissioning High Beta Optics Validation Shift Plan / Summary
2023-06-13 12:00 2023-06-13 13:00 0W Analysis Preparation of 3Qy knobs for next MD
2023-06-14 05:00 2023-06-14 15:15 1W MD 9549 b5 RDT corr, 3Qy corr, b4 RDT Shift Plan / Summary
2023-06-15 03:30 2023-06-15 03:40 0WN MD 9543 Failing IR corrs MD: abbanded for cryo Shift Plan / Summary
2023-07-14 01:00 2023-07-14 04:30 0.5WN Commissioning Ions Optics commissioning 14/07 Shift Plan / Summary
2023-08-30 18:50 2023-08-30 21:30 0.5WN Commissioning INJ+FT revalidation post triplet repair Shift Plan / Summary
2023-08-31 00:00 2023-08-31 04:30 0.5WN Commissioning 30cm re-validation + f2002 at inj Shift Plan / Summary
2023-09-01 20:30 2023-09-02 04:30 1HN Commissioning High Beta Optics corrections Shift Plan / Summary
2023-09-03 01:00 2023-09-03 04:40 0.5HN Commissioning PPref optics validation Shift Plan / Summary
2023-09-06 00:00 2023-09-06 01:00 0W Analysis Review of Bad BPMs over recent meas
2023-09-12 00:00 2023-09-12 01:00 0WN Analysis Re-analysis of ION b3 scan in BBsrc
2023-09-13 00:00 2023-09-13 01:00 0WN Commissioning 13/09 Failed ION commissioning Shift Plan / Summary
2023-09-14 02:30 2023-09-14 05:00 0.25WN Commissioning 14/09 Failed ION commissioning Shift Plan / Summary
2023-09-14 15:30 2023-09-14 19:30 0.5W 0.5WN Commissioning ION optics at FT validation. B3 corrs Shift Plan / Summary
2023-09-21 09:30 2023-09-21 14:00 1W MD 10385 MO response at Injection Shift Plan / Summary
2023-10-26 12:30 2023-10-26 15:15 0.5W Commissioning ION optics in ramp. Dispersion at FT Shift Plan / Summary
2023-11-01 23:28 2023-11-01 23:41 0WN Analysis Re-analysis of ions ramp. 3Qy vs ramp