2023-04-12 10:00 2023-04-12 17:00 1W MD Vittorio Settup of bare machine flat cycle and Q/Q' measurements. TbT data checks Start
2023-04-17 23:00 2023-04-18 04:00 0.5W MD Wietse zero dispersion Start
2023-04-19 20:40 2023-04-20 01:30 0.5W MD Wietse 3Qy rdt measurement vs skew sextupole strength. Start
2023-04-22 02:40 2023-04-22 05:30 0.5W MD Wietse 3Qy rdt measurement vs skew sextupole strength. Also trying octupole RDT Start
2023-04-25 10:30 2023-04-25 15:00 0.5W MD Vittorio Tune and chroma on the 10GeV cycle Start
2023-05-02 15:30 2023-05-02 17:00 0.1W MD Ewen Logging data during gammatr jump for radial loop study Start
2023-05-10 16:30 2023-05-10 18:30 0.2W MD Vittorio 18GeV bare machine cycle Start
2023-05-11 10:00 2023-05-11 16:00 0.5W MD Vittorio 18GeV bare machine cycle Start
2023-05-23 10:30 2023-05-23 10:30 0.1W MD Wietse zero dispersion with different PSB beams - no end time in elog Start
2023-06-07 11:00 2023-06-07 15:00 0.5W MD Vittorio 23GeV bare machine cycle Start
2023-06-08 11:00 2023-06-08 15:00 0.5W MD Vittorio 23GeV bare machine cycle Start
2023-06-09 17:00 2023-06-09 18:00 0.1W MD Vittorio 23GeV bare machine cycle Start
2023-06-14 10:30 2023-06-14 12:30 0.2W MD Wietse Synchronizing BBQ with regular BPMs test Start
2023-06-16 10:00 2023-06-16 17:30 1W MD Vittorio 7GeV bare machine cycle Start
2023-06-20 16:30 2023-06-20 17:30 0.1W MD Ewen Logging data during gammatr jump for radial loop study Start
2023-07-03 10:30 2023-07-03 11:30 0.1W MD Ewen debugging TBT acquesition Start
2023-07-05 10:30 2023-07-05 11:30 0.1W MD Ewen debugging TBT acquesition on Wietse's cycles Start
2023-07-12 17:40 2023-07-12 19:30 0.2W MD Vittorio 14GeV bare machine cycle Start
2023-07-13 16:30 2023-07-13 17:30 0.1W MD Ewen debugging TBT acquesition on Wietse's cycles Start
2023-07-17 10:30 2023-07-17 14:30 0.5W MD Vittorio testing 10GeV cycle with PFW and F8L Start
2023-07-27 14:30 2023-07-27 15:30 0.1W MD Wietse zero dispersion with different PSB beams Start
2023-08-03 09:44 2023-08-03 13:30 0.5W MD Wietse zero dispersion with different PSB emits Start
2023-08-04 10:30 2023-08-04 10:30 0.0W MD Wietse zero dispersion - no clear entry in elog Start
2023-08-07 11:30 2023-08-07 15:30 0.5W MD Wietse 3Qy RDT measurements Start
2023-08-10 11:30 2023-08-10 17:30 0.5W MD Wietse Zero disperions optics with different intensities Start
2023-08-14 11:00 2023-08-14 15:30 0.5W MD Wietse Testing 3Qy correction Start
2023-09-11 16:40 2023-09-11 18:10 0.5W MD Vittorio Tune and chroma on 5GeV cycle Start
2023-09-14 15:15 2023-09-14 18:10 0.25W MD Vittorio Tune and chroma on 23GeV cycle Start
2023-09-15 09:45 2023-09-15 15:00 0.5W MD Vittorio Chroma meas on 23GeV cycle, kicking with ACD during 23GeV ramp Start
2023-09-26 15:15 2023-09-26 17:00 0.25W MD Vittorio Bare machine chroma meas at different energies + testing varying F8L/PFW on 23GeV Start
2023-09-29 16:30 2023-09-29 19:30 0.5W MD Vittorio Bare machine at different energies on same day Start
2023-10-02 20:30 2023-10-02 23:15 0.5WN MD Wietse Statistics for zero dispersion study Start
2023-10-06 10:00 2023-10-06 18:30 1W MD Vittorio Bare machine at different energies + MRP corr Start
2023-10-09 10:00 2023-10-09 17:30 1W MD Vittorio Bare machine at different energies + MRP corr Start
2023-10-10 14:10 2023-10-10 18:30 0.5W MD Wietse Extra zero dispersion + new RDT measurements. MD9408 Start
2023-10-18 22:30 2023-10-19 04:00 1WN MD Vittorio 23GeV bare cycle saturation study Start
2023-10-19 16:00 2023-10-20 19:00 0.5W MD Vittorio tune vs F8L on 10GeV Start
2023-10-20 02:00 2023-10-20 17:30 0.5W MD Vittorio tune vs F8L on 10GeV cont Start
2023-10-22 14:30 2023-10-22 18:00 0.5W MD Wietse cycle settup for RDT study (2Qx+Qy) Start
2023-10-23 14:00 2023-10-23 17:30 0.5W MD Vittorio chroma vs F8L on 10GeV Start
2023-10-23 18:10 2023-10-24 00:30 1WN MD Wietse RDT study (2Qx+Qy) Start
2023-10-23 23:00 2023-10-24 06:00 1WN MD Vittorio chroma vs F8L on 10GeV cont. Start
2023-10-24 00:50 2023-10-24 07:00 1WN MD Wietse PFW control with ML test Start
2023-10-25 00:00 2023-10-25 04:00 0.5WN MD Vittorio varying F8L on 18GeV Start
2023-10-25 04:30 2023-10-25 11:10 1W MD Wietse PFW control with ML test Start
2023-10-25 15:45 2023-10-26 01:30 1WN MD Vittorio Q/Q' on 18GeV with PFW Start
2023-10-26 01:30 2023-10-26 08:00 1WN MD Wietse PFW-control with ML test Start
2023-10-26 14:00 2023-10-26 17:30 0.5W MD Ewen Radial loop with ACD Start
2023-10-26 15:00 2023-10-28 04:00 1.5WN MD Vittorio Q/Q' vs energy on bare machine cycles Start
2023-10-27 01:00 2023-10-27 07:00 1WN MD Wietse PFW-control with ML test Start
2023-10-27 20:00 2023-10-27 20:30 0.1WN MD Ewen ACD kicks to survive 10GeV ramp Start
2023-10-28 14:45 2023-10-28 22:36 1H MD Vittorio Q/Q' dependence on PFW at 10GeV Start
2023-10-29 11:30 2023-10-29 15:30 0.5H MD Ewen ACD through transition + 18GeV optics meas on 23GeV cycle Start
2023-10-29 14:00 2023-10-29 18:00 0.5H MD Vittorio Q/Q' on 10/18GeV cycle with PFW Start
2023-11-01 09:30 2023-11-01 17:00 1W MD Wietse Testing f2010 correction, and comp i/k calibraiton from f0030 to f2010 Start
2023-11-01 15:00 2023-11-01 20:00 0.5W MD Vittorio Q and Q' change and ACDmeas with F8L on 2GeV bare machine Start
2023-11-02 10:30 2023-11-02 20:00 1W MD Vittorio Q and Q' change with F8L and PFW on 2GeV bare machine Start
2023-11-03 10:00 2023-11-03 15:00 0.5W MD Ewen Preparation and test of GammaTR jump on flat cycle + ACD kicks through knobs Start
2023-11-03 10:30 2023-11-03 20:00 1W MD Vittorio Q and Q' change with F8L and PFW on 2GeV bare machine plus measurements with AC Dipole excitation Start