Timeline of LHC Run 3 Measurements in 2024

This page provides quick access links to logbook entries of important OMC shifts or measurements done during the LHC 2024 commissioning and MDs. Some entries (underlined) offer a tooltip when hovered, with a quick description of the important information from that entry. The tables below can be sorted by clicking next to the column headers.

Results Visualization

Various results graphs and the scripts to make them are available in lintrack:

/afs/cern.ch/eng/sl/lintrack/LHC_commissioning2024/

Start Date End Date Shifts Type Shift Purpose Logbook Link
2024-03-08 16:45 2024-03-09 03:10 0.5W 0.5WN Commissioning Injection Optics Global Corrs Shift Plan / Summary
2024-03-09 16:00 2024-03-10 03:00 0.5H 0.5HN Commissioning 30cm Local Corrs and Injection Meas Shift Plan / Summary
2024-03-10 15:16 2024-03-11 05:00 0.5H 1HN Commissioning Injection Linear and NL Chroma Shift Plan / Summary
2024-03-11 23:00 2024-03-12 01:30 0.3WN Commissioning Van Der Meer optics and k-mod Shift Plan / Summary
2024-03-12 23:00 2024-03-13 04:30 1WN Commissioning Inj. Global w/o kq5, f1020 and b5-RDT Corrs Shift Plan / Summary
2024-03-14 01:00 2024-03-14 09:00 1WN Commissioning Nonlinear Corrections at 30cm - 1 Shift Plan / Summary
2024-03-16 15:00 2024-03-17 03:00 0.5H 0.5HN Commissioning Nonlinear Corrections at injection Shift Plan / Summary
2024-03-18 22:40 2024-03-19 07:00 1WN Commissioning Nonlinear Corrections at 30cm - 2 Shift Plan / Summary
2024-03-22 07:00 2024-03-22 16:00 1W Commissioning Global Corrections in the Squeeze Shift Plan / Summary
2024-03-24 10:40 2024-03-24 19:15 1H Commissioning Meas. in Ramp & Squeeze validation B1 Shift Plan / Summary
2024-03-25 07:00 2024-03-25 15:16 0.3WN Commissioning Squeeze validation Beam 2 and NL optics Shift Plan / Summary
2024-03-31 12:00 2024-03-31 23:00 1.5H Commissioning NL at Injection and Ion Cycle Shift Plan / Summary
2024-04-01 15:30 2024-04-01 23:00 1H Commissioning Squeeze 30cm-22cm Shift Plan / Summary
2024-04-09 12:30 2024-04-09 14:00 0.3W Commissioning Measurements with Beam-Beam Wires Shift Plan / Summary